Frag Out! Magazine

Frag Out! Magazine #22

Frag Out! Magazine

Issue link: https://fragout.uberflip.com/i/1064315

Contents of this Issue

Navigation

Page 43 of 201

The construction works on prototype vessel were started in November 2017. Contract for the 230M PLN (approx. 61M USD) was finally award- ed in June 2017 after the six month long bureau- cracy battle. New tugboats are scheduled to be delivered in 2019-2020 and will provide combat and logistical support in coastal and maritime ar- eas, support maritime search and rescue opera- tions, conduct cargo missions, decontamination and serve as torpedo trials crafts. Vessels will replace other tugboats and some other auxiliary crafts, such as K-8 torpedo trials craft. The ORP Bolko ship sponsor was Mrs. Honorata Hyżyk, director of No.2 Elementary School in Leszno. The prototype H-11 craft will be delivered in 2019 and another five in 2020. Currently in Remon- www.fragoutmag.com

Articles in this issue

Links on this page

Archives of this issue

view archives of Frag Out! Magazine - Frag Out! Magazine #22