most probably, be assigned to the Bydgoszcz-based WZL Nr
2 S.A. facility. Memorandum on cooperation covers a com-
prehensive logistics support scheme, repairs, overhauls, and
upgrades. It was signed on December 12th, 2023. Delivery
of series-manufactured, brand-new jets in this configuration
(36 examples) is to be finalized between 2025 and 2028.
The aircraft are to be fitted with RTX PhantomStrike radars,
and Lockheed Martin Sniper targeting pods, and be integra-
ted with Thales Scorpion HMCS. Moreover, the new aircraft
are also to be integrated with the standard air-to-air missiles
used by the Polish Air Force (AIM-9X Sidewinder, AIM-120
AMRAAM).
All Jets Delivered
KAI FA-50GF
Fighting Eagle
AVIATION